MNJ Fabrication Stainless Snorkel Air Intake System for 4Runner (2025+)
- In stock, ready to ship
- Backordered, shipping soon
Stop choking your engine with a restrictive factory intake.
This isn’t just a snorkeI, it’s a complete airflow upgrade designed for real-world off-road abuse, clean engine bay integration, and maximum reliability when conditions get rough.
Built from premium stainless steel, this system is made to handle everything from deep water crossings to fine dust trails without the cracking, fading, or failure you see in plastic alternatives.
Key Features
-
4” Mandrel-Bent 304 Stainless Steel
Built for maximum durability, corrosion resistance, and high airflow. -
Complete Intake System Design
Engineered around a custom airbox developed in collaboration with SXTH Element for proper airflow and sealing. -
High-Flow 4” Intake Path
Reduces restriction compared to factory routing. -
All-Metal Construction
No plastic components—eliminates common failure points. -
Precision Fitment
Designed for:
- 6th Gen Toyota 4Runner
- 4th Gen Toyota Tacoma
-
Built for Harsh Conditions
Keeps intake elevated and protected from dust, debris, and water exposure
Airbox Compatibility
- Fully compatible with the SXTH Element airbox
- Our custom airbox option is designed to provide enhanced sealing and tighter system integration
Important Note
-
This system does NOT increase the vehicle’s water fording depth.
Proper sealing and vehicle limitations still apply.
How the Drop Works
When the drop opens, you’ll have a one-month window to secure your snorkel. During this time, orders are open and available to anyone who wants in.
Once the window closes, that’s it—no more orders will be accepted. Production will begin immediately after, and all units will be built based on the orders placed during the drop.
Because each snorkel is built with a high number of custom components and takes approximately 12 hours to manufacture, there is a 6–8 week lead time after the drop window closes before orders are completed and shipped.
This approach allows us to focus on quality, precision, and delivering a fully dialed product—no shortcuts, no excess inventory.
Key Points:
- Drop window is open for 30 days only
- Orders are made-to-order
- Each unit takes ~12 hours to manufacture
- 6–8 week lead time after the drop closes
- Limited opportunity—miss it and you’re waiting for the next run